Gizmo
Wizard
Registered: 01/10/00
Posts: 5133
Loc: Portland, OR, USA
Yeh, they feel better about themselves with it looking like the end of the week they have two days off instead of one at the end and one at the beginning
Registered: 01/25/03
Posts: 3765
Loc: Saint Johns, PA
Quote:
Originally posted by Gizzy:
Yeh, they feel better about themselves with it looking like the end of the week they have two days off instead of one at the end and one at the beginning
time for a little history lesson.
America = 1776 Europe = A LOT FURTHER BACK
It's more like we changed the first day so the week would be more symmetrical, cause symmertrical is always better
here's another question I installed the Calendar mod, and it's working nicely, except: on the control panel, when I try to get into "Calendar" under "modifications" I get this error message:
Quote:
quote: The page and/or tab you requested is unavailable. The required code could not be properly loaded. Please ensure that all scripts, libraries, and templates have been properly uploaded.
Any ideas what I should be looking at to fix this?
Is there a way to make is so you can span events across several days, rather than say having to click on each day and enter an event for a week long event?
Also, when I try to add an event without a description it gives me an error with rolleyes (it does have colons around it), but doesn't show the smiley. Do I need to move that gif into the cgi directory?